Gas Collection Work

  • Jan 24, 2024
  • 1 min read

We have located a gas collection well on the side slope of cell 11 that has a reduced vacuum source. This is a relatively high gas-producing well with an impacted vacuum line that will need to be replaced. We have a contractor scheduled for tomorrow to commence this effort. We will also be installing an additional Horizontal collector to increase gas capture in this area. This work will be conducted as quickly as possible but will take about a week to complete. We will employ all practical odor control measures during this work.



 
 
 

Recent Posts

See All
Cell 15 Construction Activity:

Over the next three to four weeks, we will be installing a 12-inch gas header at High Acres in Cell 15. This gas header construction consists of approximately 1350 LF of header pipe and multiple later

 
 
 