We have located a gas collection well on the side slope of cell 11 that has a reduced vacuum source. This is a relatively high gas-producing well with an impacted vacuum line that will need to be replaced. We have a contractor scheduled for tomorrow to commence this effort. We will also be installing an additional Horizontal collector to increase gas capture in this area. This work will be conducted as quickly as possible but will take about a week to complete. We will employ all practical odor control measures during this work.