top of page
Search

High Acres Power Plant update

  • May 14, 2023
  • 1 min read

Both power plants are down for testing. Flares are operating normally, no impact to the gas collection and control system is expected.

 
 
 

Recent Posts

See All
Cell 15 Construction Activity:

Over the next three to four weeks, we will be installing a 12-inch gas header at High Acres in Cell 15. This gas header construction consists of approximately 1350 LF of header pipe and multiple later

 
 
 

Comments


©2022 by High Acres Landfill Operational Updates. Proudly created with Wix.com

bottom of page