The power to the facility was disconnected due to testing and we are currently running off of generator power.

 
 
 

Recent Posts

See All
Power outage

Due to the Fairport-wide power outage, the entire High Acres Facility has lost power including the Powerplant. We are flaring with  back up generation.

 
 
 