May 13, 2023High Acres Powerplant UpdateAll engines are back up and running after being shut down for the day for testing. Flares are operating normally, and there was no impact to the gas collection and control system.
All engines are back up and running after being shut down for the day for testing. Flares are operating normally, and there was no impact to the gas collection and control system.
Today's Construction Activity 11/19/24:REMINDER TO RESIDENTS TO USE THE DEDICATED HOTLINE: NYSDEC Odor Hotline and Verification System: (585) 453-2416 (A dedicated odor hotline...
Comments