All engines are back up and running after being shut down for the day for testing. Flares are operating normally, and there was no impact to the gas collection and control system.
Over the next three to four weeks, we will be installing a 12-inch gas header at High Acres in Cell 15. This gas header construction consists of approximately 1350 LF of header pipe and multiple later