Power plant / Gas update:

  • Jan 9, 2024
  • 1 min read

Last night around 11pm the Open Flare shut down due to a technical interruption and was back up and running after resolving the issue around 5am this morning. During the shutdown, gas was collected and managed by the on-site enclosed flare.

 
 
 

Recent Posts

See All
Cell 15 Construction Activity:

Over the next three to four weeks, we will be installing a 12-inch gas header at High Acres in Cell 15. This gas header construction consists of approximately 1350 LF of header pipe and multiple later

 
 
 