Daily Operations:


The active working face is currently located in cells 11, 12 and 13. The working face is processing both rail and street volume and is utilizing clean soil, approved alternative daily cover and the Envirocover machine. The perimeter water/vapor-based neutralizer systems, and truck wash are also in operation.


NYSDEC Odor Hotline and Verification System: (585) 453-2416

A dedicated odor hotline and verification system for residents to report and record any concerns regarding High Acres Landfill and its operation.


Neutralizer Systems in use:




Daily Cover Enviro Cover Machine in use:




Construction Activities:


Temporary odors may occur during trenching and construction activities necessary for project completion and future improvements.


On Wednesday, October 9, we have scheduled maintenance planned for the Zink Enclosed Flare on site. This work is part of the routine preventative maintenance and monitoring program for our gas equipment. The work is currently scheduled to begin at 7:00 am and will be completed at the close of normal business hours. Our Crew has been instructed to minimize any odor impacts associated with this scheduled maintenance event. All other site gas collection and controls will be unaffected, and the odor control system will be online.


Cell 15A-1 Construction, 10 acres. Primary Drainage Layer has started, we expect completion by early October.


Primary Drainage Stone on Cell 15A1 being installed (August 2024)

East Perimeter Berm Construction – Started excavation and structural fill placement in early

May.  Approximately 280cy have been excavated to date.  Anticipate Fall completion.


photo July 2024




Starting in October, we are deploying 6 acres of temporary cap north slope of cells 8 and 9.


Renewable Energy Powerplant and Landfill Gas Management:


Continuous use of gas collection wells and flares for odor control. Ongoing work includes raising gas collection wells, installation of additional horizontal gas collectors, installation of gas vacuum lines, and upgrades to the gas collection wells for drainage and collection enhancement. Well-raising is a daily activity in coordination with filling operations.





WM has invested over $2.3 million in 2023 into the HALRC gas collection and control system. Most notably a new flare adjacent to Perinton Parkway was commissioned in November. This new flare will allow WM the flexibility to apply greater amounts of influence on the waste mass and destroy higher volumes of landfill gas. Technicians are working diligently to rebalance the field. Some instabilities are expected while this effort takes place. In addition, an upgrade to the LFG conveyance infrastructure has begun. This project will provide greater amounts of opportunity to expand the collection system in the future.







Current Events:


New Price List below as of 11/1/24





2024 WM Sustainability Report - WM is committed to consistent and meaningful public disclosure and discussion of our sustainability progress through the publication of our annual Sustainability Report. Read the PDF below to learn more.



On 10/9 , from approx. 7am- 3pm officers of the RPD will be conducting Training sessions on the High Acres Sports Complex property. There will be approximately 40 officers along with their vehicles and other necessary equipment. There will be necessary safety signage for awareness.


(Aerial footage of the High Acres Sports Complex)




Please click the link below to access the Town's updates and news regarding WM High Acres Landfill and Recycling Center in the Town of Perinton.



The Ecopark now has a dedicated area accepting NYS returnable beverage containers to help support local charities.


Visit Ecopark at 10 Avion Dr. Rochester, NY 14624