Today, we discovered several frozen gas/ valves/drainage lines during our site evaluation. Our crews are remediating each affected line. The Site Flares are operating and unaffected. The site conditions should be restored shortly with the necessary corrective actions completed.


 


 
 
 

Recent Posts

See All
Cell 15 Construction Activity:

Over the next three to four weeks, we will be installing a 12-inch gas header at High Acres in Cell 15. This gas header construction consists of approximately 1350 LF of header pipe and multiple later

 
 
 